Fusion Developers

FUSION DEVELOPERS (PVT) LTD

QUOTATION — BTI / Venue Pharma PEB Shed (14-Column Basis)
Ref FD/BTI/VEN-PHA/CB14-001 | 03 Aug 2026 | Validity 30 Days

1. Building Specifications (LOCKED — FD-VP-CB-001)

ParameterValue
Span (Frontage)55 ft
Length (Depth)77 ft
Frame Lines / Columns5 frames / 14 columns
Rafters9 (6 end @18'-4", 3 internal @55'-0")
Eave / Ridge Height18 ft / 22.2 ft
Roof Slope1:10
Floor Area4,235 sqft

2. Option 1 — Roof Only (with 25mm Glasswool)

CategoryAmount (Rs.)
Structural Steel (HR)Rs. 2,613,192
Roof PurlinsRs. 395,236
Fasteners & HardwareRs. 84,993
Roof Cladding + InsulationRs. 889,767
Labour, Site & OverheadsRs. 792,226
GRAND TOTAL (incl 18% GST)Rs. 5,634,989

3. Option 2 — Roof + 4-Side Wall Cladding (Recommended)

CategoryAmount (Rs.)
Structural Steel (HR)Rs. 2,613,192
Purlins + Wall GirtsRs. 627,359
Fasteners & HardwareRs. 121,418
Roof + Wall Cladding + InsulationRs. 1,815,851
Labour, Site & OverheadsRs. 1,760,503
GRAND TOTAL (incl 18% GST)Rs. 8,187,221

4. Payment Schedule

Milestone%Opt 1Opt 2
M1 — Advance/Mobilization15%Rs. 716,312Rs. 1,040,748
M2 — Fabrication Start25%Rs. 1,193,854Rs. 1,734,581
M3 — Material at Site20%Rs. 955,083Rs. 1,387,665
M4 — Structure Erected20%Rs. 955,083Rs. 1,387,665
M5 — Cladding Complete15%Rs. 716,312Rs. 1,040,748
M6 — Final Handover5%Rs. 238,771Rs. 346,916

Terms: 30-day validity. GST 18% extra. Foundation materials & statutory approvals excluded. Soil bearing assumed 100 kPa. Lahore arbitration. DRAFT — pending FD-ARCH-SR-001 sign-off.

For Fusion Developers (Pvt) Ltd — Authorized Signatory. Date: 03 Aug 2026